The new building features a Fitness Studio, Multi-Purpose Room, Cafeteria, Wave Pool, Rapid River, Toddlers Pool, Training Pool, Dive Pool and Activity Pool. View a photo gallery showing artists' impressions of the Fitness Studio.
The Main Pool will incorporate a movable floor and end walls to enable it to be reconfigured into a 25 metre Training Pool for clubs and public lane swimming. Reconfiguration will also create an Activity Pool for Swimming Lessons and Aquafit and a Diving Pool with 1 Metre and 3 Metre Diving Boards and a 5 Metre Platform as well as being the Splashdown pool for a brand new Cannonball slide. The photo gallery below shows the progress being made on the 50 metre Main Pool.